QLECTOR LEAP - Latest changes

2.486.0

  • People/Shift-board-Recommend a schedule. To select a scheduled worker, hold down the ALT key and move your mouse over the worker. The background will turn blue, indicating that the worker can be selected. Click on the blue-highlighted box to select the worker. Once selected, the worker’s details will be displayed, allowing you to re-schedule them.

-image

  • Minor improvements and bug fixes

2.482.0

  • Chunking improvements
  • Minor fixes and performance improvements

2.476.0

  • Minor improvements and bug fixes

2.474.0

  • Minor improvements and bug fixes

2.471.0

  • Minor improvements and bug fixes

2.470.0

  • Minor improvements and bug fixes

2.469.0

  • Added priority badge to unscheduled orders on planning table
  • Minor improvements and bug fixes

2.465.0

  • Minor improvements and bug fixes

2.464.0

  • Minor improvements and bug fixes

2.463.0

  • Added tool change indicator in left menu
  • image

2.462.0

  • Added export to xlsx button to new ticketing tool changes view -image

2.460.0

  • Minor improvements and bug fixes

2.458.0

  • Tool changes: added export to xlsx file. -image
  • Operation details now displays if operation is ignored or not. -image
  • Minor improvements and bug fixes

2.457.0

  • Added operation priority badges (A, B, C, D, E) -image
  • Planning table: added “ERP start” to tooltop for scheduled orders, “ERP start/end” are always reflect state in database
  • Initial earliest start/end time has been removed from technical details -image -image

2.455.0

  • Minor improvements and bug fixes

2.454.0

  • Minor improvements and bug fixes

2.452.0

  • Minor improvements and bug fixes

2.451.0

  • The (U)nrealised badge is shown on the Gantt Chart when the cursor is placed on the order, same as on the Planning table
  • Fixed translations in Save & Sync dialog on planning table
  • Minor improvements and bug fixes

2.450.0

  • Minor improvements and bug fixes

2.449.0

  • SA Model/Users - minor improvements have been made to the header, making it sticky to remain visible while scrolling.

2.448.0

  • tooltip now displays also start and end time of the operation, as it is scheduled on the planning table
  • Minor improvements and bug fixes

2.447.0

  • Minor improvements and bug fixes

2.446.0

  • Future KPI screen: added timestamp of last recompute, added button for manual recompute (Admins and Powerusers)

2.445.0

  • Minor improvements

2.443.0

  • Option to display and name a custom field (in the line group settings): microplan_show_order_table_custom_field and microplan_order_table_custom_field_title. This field is displayed in the Microplan view, and the values in this field are determined by integration.

2.442.0

  • Option to export employee competencies

2.441.0

  • Line-group matrix improvements: able to select/deselect all items, the columns “Automatic scheduling” and “Manual scheduling” are separated for selection.

2.440.0

  • Planning table performance optimization

2.437.0

  • Planning table: Tooltip also displays productions in the current shift
  • Planning table: Tooltip displays the modified line capacity
  • Minor improvements and bug fixes

2.436.0

  • Automatic planning: save used parameters and enable re-running with the same parameters
  • Compute planning score
  • image

2.434.0

  • Process orders are now supported
  • New feature: Templates for people scheduling
  • API for competencies are now available
  • Minor improvements and bug fixes

2.433.0

  • Planning table: display material ID in the Needs pane
  • Some functions were disabled for non-administrator users
  • Minor fixes and improvements

2.430.0

  • Minor improvements and bug fixes

2.429.0

  • Minor improvements and bug fixes

2.428.0

  • Production data-new page for work order and production browsing in Digital Twin. This page allows for swift searching using Order ID, Process number, Operation ID, Operation, Material ID, Material, Line ID, or Plant information.
  • Small improvements on Gantt Chart
  • Improved insights on planning table

2.427.0

  • Line Groups: Fixed the issue of not detecting lines even though the line group contains lines.
  • Planning Table: Fixed issue with overlapping tables.

2.426.0

  • Digital Twin/Line Groups enable filtering by materials/processes and work centers.
  • System Administration: Minor changes in the appearance of titles and button positioning.
  • Minor fixes and performance improvements
  • New Tag: default skip_sim

2.425.0

  • Digital Twin: fixed problem with filtering the materials.

2.423.0

  • Chunking improvements
  • Minor changes in title sizes and button positions.
  • Minor fixes and performance improvements

2.422.0

  • Minor fixes and performance improvements

4.418.0

  • Ability to view the last few digits of the material number on the Gantt Chart if it is not possible to see the entire material number
  • Enabled changes saving on Planning table for Qlector users

4.417.0

  • Change of Stock Requirement’s pane to be always translucent
  • Updated German insight translations
  • Fixed Stock Forecast error on Planning table

2.415.0

  • Minor improvements on Planning table, fixed position of process number
  • Fixed position of ‘Show details’ button on stock status page

2.413.0

  • Planning table: drag&drop while holding SHIFT key will not snap, and exact time will show until dropped.
  • Planning table speed optimization

2.412.0

  • Planning table: created production orders that are not yet released get a different color: dots on a solid background. This makes it easier to create and manage production orders before they are ready for production.
  • Planning table: process number on all operations of the same order is shown when an operation is selected, to help identify the correct sequence when doing manual scheduling.
  • Planning table: filters get new look
  • Microplan: timestamp added to printout
  • Miscellaneous improvements

2.411.0

  • Minor issues that occurred during manual entry of comments by cooperators have been resolved. Now, when a cooperator edits a comment, the tasks are not automatically shifted to them.
  • Planning table/Synchronize button - all buttons labeled “Save” and the Refresh from PIS button are disabled.
  • Kiosk user page: minor changes have been made to the appearance.

2.410.0

  • The changes in the allocation of the quantity of shifts per individual have been made, double shifts are disabled.
  • Removed modules for Kiosk user.

2.409.0

  • Added a new button “Issues” on the planning table.
  • Added a new label “stock_forecast_show_withdrawn_and_unaccounted_option” in the Line Groups tab.
  • Added a new option to view Stock Status, where it is now possible to see how many items are still available out of the total delivered stock quantity.
  • Resolved minor issues on the planning table, related to visualization.
  • Stock Forecast and Planning table: Operations that are more useful have been merged and placed at the top of the page.
  • Minor improvements on Production Guiding/Plan/Manual order entry: fixed export to XLSX issue on Manual order entry.

2.407.0

  • Minor changes to the Digital Twin window, where now, when clicking on one of the operations (Plants, Materials, etc.), the cell is highlighted in a different color than the others, it turns into a darker gray.
  • Added a “Production” button on the Gantt chart (Order Details), the button is accessible to all users, and the task status is automatically refreshed. At the bottom of the page, there is a sum of the total operation quantity.

2.406.0

  • Stock forecast: when line filter is active, certain produced materials can be highlighted (those with primary production version on selected line, or materials that are currently scheduled on this line
  • Planning table/stock forecast view: filter by material title, aggregate by shift/day/week (same as Stocks/Stock forecast view)
  • Small translation changes under Chunk order window

2.405.0

  • Aging operations are now handled by delay in posting to stock. Aging view is still available for easier shopfloor management, but stocks do not depend on it.
  • Minor improvement of Chunk operation modal window

2.404.0

  • Minor fixes and performance improvements

2.403.0

  • New feature: Linking operations. Operations can be linked to another operation (leading operation) via ctrl+click menu on the planning table. Both operations can then be scheduled together. The link can also be manually removed.

2.402.0

  • Stock requirements view is now separated for inbound and outbound deliveries (requirements).
  • Wait time is now taken into account in simulation. If an operation has wait time defined, the next operation will be planned with the same delay. If user schedules next operation too early, an insight is shown.
  • Operationer chunking fixes

2.401.0

  • Minor fixes and performance improvements

2.400.0

  • Minor fixes and performance improvements

2.399.0

  • Operation chunking enhancements

2.398.0

  • Minor fixes and performance improvements

2.397.0

  • Minor fixes and performance improvements

2.396.0

  • New feature: operation chunking. An operation can be split into multiple chunks and scheduled independently.

2.395.0

  • Stock requirements: user can add and edit a comment for each requirement
  • moved tag (import new orders skip sim) from lg to plant

2.394.0

  • New setting available for Line group: save_whole_lines_to_erp. Selects all operations on the same workcenter on the save modal window.

2.393.0

  • Improved simulation of parallel orders
  • Improved BOM handling
  • Planning table: Retry button added to Actions menu. If drag&drop action fails, user can click retry.

2.392.0

  • Fixed export to excel
  • Move order logic fixed: setting a start date/time does not reschedule other orders that start before the set date/time
  • When setting or changing manual shifts calendar for plant or line, the change is updated automatically
  • NEW: when rescheduling operations on planning table, the action can be cancelled if it takes too long to execute.

2.391.0

  • Minor fixes and performance improvements

2.390.0

  • fixed shift-assignment rotation
  • new furnace planning logic

2.389.0

  • Fixed “Change time” bug for unscheduled operations
  • Added scheduled status to operation modal dialog
  • All management functions are now available in Modules (either SA or DT)

2.388.0

  • Minor fixes and performance improvements

2.387.0

  • Minor fixes and performance improvements

2.386.0

  • Minor fixes and performance improvements

2.385.0

  • Users management is moved to SA - System Administration module
  • image

2.384.0

  • Planning table: highlight preferred production version
  • Gantt chart zoom fix

2.383.0

  • Planning table: Move function fixed
  • autoscroll fixed
  • Fixed overlapping operations
  • New module SA
  • New org tag: save changes to operations on connected linegroups
  • Edit user page fixed

2.382.0

  • Save all operatons from order, also from in other linegroups

2.381.0

  • Minor fixes and performance improvements

2.380.0

  • Planning table: display stock status situation as it was used for automatic scheduling

2.379.0

  • Sync modal does not display ignored operations
  • Weekly realization numbers fix

2.378.0

  • Powerusers edit users authorisation

2.377.0

  • Gantt redirect fix

2.376.0

  • New navigation structure
  • Autopilot lines save capability
  • Manual order entry fixes
  • KPI dashboards

2.375.0

  • Minor fixes and performance improvements

2.374.0

  • Fix: child lines now have correct weekly realisation

2.371.0

  • Stock status view: added option so show also materials with zero stock

2.368.0

  • Fixed display of long texts in weekly realisation

2.367.0

  • Loader shown while loading custom filters in plannning board

2.366.0

  • Minor fixes and performance improvements

2.365.0

  • Enhanced Autopilot lines
  • Start times fix on microplan
  • Plant field not pre-filled when adding new line

2.364.0

  • Fixed synchronization when ignored operations exist
  • Minor fixes and performance improvements

2.363.0

  • Planning table: normative shown on tooltip
  • Manual order entry: Date required field added
  • Adjustments for SAP S4Hana

2.361.0

  • Minor fixes and performance improvements

2.360.0

  • Minor fixes and performance improvements

2.359.0

  • Fixed titles (order -> operation)

2.358.0

  • Fixed Insight generation
  • “autopilot” mode fix for subcontractors
  • Minor fixes and performance improvements

2.357.0

  • Minor fixes and performance improvements

2.356.0

  • New view for tool management. A status can be set for each tool, and which product it is currently set up for. Each tool shows the next planned use.
  • image
  • Minor fixes and performance improvements

2.355.0

  • Minor fixes and performance improvements

2.354.0

  • Fised missing week numbers on Gantt chart
  • Minor fixes and performance improvements

2.353.0

  • Gantt chart: overlapping operations when history enabled are now in single line
  • Restored Ignore function on Microplan
  • Minor fixes and performance improvements

2.352.0

  • Fixed “Change time” function
  • Fixed Lock function (planning table)

2.351.0

  • Simulation speedup

2.350.0

  • Ignored operations can now be managed from the planning table
  • “Autopilot” line option: operations are scheduled according to finish time of previous operation

2.349.0

  • Write to LARGO with feedback
  • Minor fixes and performance improvements

2.348.0

  • Minor fixes and performance improvements

2.347.0

  • Improved visual style of planning table
  • Performance of planning table improved
  • Minor fixes and performance improvements

2.345.0

  • Minor fixes and performance improvements

2.344.0

  • Order selection improvement
  • Kiosk mode enhancements
  • Minor fixes and performance improvements

2.343.0

  • Minor fixes and performance improvements

2.342.0

  • Missing disabled shifts hotfix
  • Minor fixes and performance improvements

2.341.0

  • New insight added: besides a scheduled operations, there are also unscheduled operations from the same order
  • Minor fixes and performance improvements

2.340.0

  • Minor fixes and performance improvements

2.339.0

  • Inactive users fix

2.338.0

  • Minor fixes and performance improvements

2.337.0

  • Minor fixes and performance improvements

2.336.0

  • Minor fixes and performance improvements

2.335.0

  • Added help desk link to help menu

2.334.0

  • Resolved bug in saving shifts
  • New style on planning table
  • Minor fixes and performance improvements

2.333.0

  • Related operations are highlited:
    • Orange: provides material for selected operation
    • Red: consumes material, produced by selected operation
    • Blue: is a part of the same order
  • Support for LARGO system
  • Minor fixes and performance improvements

2.332.0

  • Improved drag&drop scheduling on planning table

2.331.0

  • Kanban: also input materials can now be tracked
  • Planning table: two options added to Synchronize:
    • Continue automatically after saving, despite any detected errors
    • Automatically refresh planning table after synchronization
  • Planning table - Unscheduled operations: Clicking the title of an operation is the same as clicking the operation itself
  • Minor fixes and performance improvements

2.330.0

  • German translations added
  • New tag: ignore horizon for importing orders. All production orders will be imported, and planned orders will be imported inside the set horizon.
  • Planning table optimizations
  • Minor fixes and performance improvements

2.329.0

  • Rework orders fix
  • Planning table prerformance improved

2.328.0

  • Fixed filter issues

2.327.0

  • Minor fixes and performance improvements

2.326.0

Fixed Ignore function for parent workorders

  • Minor fixes and performance improvements

2.324.0

  • Grey order fix

2.323.0

  • Special screen for electricity consumption
  • Manual order entry (subcontractors): export to excel, column sum
  • Minor fixes and performance improvements

2.322.0

  • Critical fix for saving shifts on planning table
  • Planning table: “scroll to order” button on left pane scrolls gantt chart to show operation

2.321.0

  • New filters on planning table. There is now only one filter and its parameter can be celected via drop-down menu.
  • image

2.320.0

  • Microplan: buttons added to Edit operation: Ignore (Operation will not be visible anywhere in plan or stock forecast) and Unscheduled (operacija is deallocated from production line).
  • image
  • Ignored operations can be accessed through a list on Microplan, and the Ignore status can be cancelled.
  • image
  • Minor fixes and performance improvements

2.319.0

  • Minor fixes and performance improvements

2.318.0

  • Minor fixes and performance improvements

2.318.0

  • Save line for multiple machine lines orders on planning table
  • A special color for insights on Stock forecast, where the stock value is positive for the day or week, but there is a call-off inside that day or week which is not covered, for example in the firs shift.
  • Minor fixes and performance improvements

2.317.0

  • Edit (comment) button for operation is now available on Ctrl+click menu on plannning board
  • Minor fixes and performance improvements

2.316.0

  • Earliest start on scheduled and unscheduled orders can be set manually (date precision)
  • Separated move and schedule actions for unscheduled order (ctrl + click menu)
  • Minor fixes and performance improvements

2.315.0

  • Planner can edit comments on opreations
  • Unscheduled orders now also have edit comment button (ctrl + click menu)

2.314.0

  • Advanced view (left pane) on planning table is now resizable.

2.313.0

  • Edit order view in microplan now shows also current production version
  • Minor fixes and performance improvements

2.312.0

  • Tooltip on line title in planning table now shows also external line ID
  • Planning table refreshes automatically after writing to ERP
  • Minor fixes and performance improvements

2.311.0

  • Move order modal window improvement
  • Minor fixes and performance improvements

2.310.0

  • New subcontracting entry and archive
  • Unscheduled operations of the same order are now grouped together
  • Minor fixes and performance improvements

2.309.0

  • Lock view. When view is locked, it stays the same regardless of selected operation. When unlocked, the view shows only lines which are possible alternatives for selected operation.
  • Improved overlapping lines
  • Minor fixes and performance improvements

2.308.0

  • Minor fixes and performance improvements

2.307.0

  • Minor fixes and performance improvements

2.306.0

  • Minor fixes and performance improvements

2.305.0

  • Speed up drag and drop
  • New Conditional capacity constraint insight
  • Stock forecast horizons (shift/day/week) can now be adjusted

2.304.0

  • Automatic scheduling of only selected line now leaves orders on non-selected as they are (instead of unscheduling them).
  • Minor fixes and performance improvements

2.303.0

  • Minor fixes and performance improvements

2.302.0

  • Fixed save to ERP progress details when saving an operation fails
  • Support for user-defined variants in scheduling parameters. A variant holds specific parameter settings which can be used in different planning scenarios.
  • Minor fixes and performance improvements

2.301.0

  • Click on cell in stock forecast displays a list of orders and lines, which produce or consume the material in that time period.
  • Minor fixes and performance improvements

Older changes

Date: 2022-07-26

  • Planning table: a Stock requirements window can be displayed, showing all requirements on a timeline. Also requirements for materials that do not have an open production order are dispalyed, so an insight (red color) can be shown. When clicking on a production order, the requirements are filtered to show only selected materials.
  • The orders frame now has a drop down menu to select list mode: scheduled orders, unscheduled orders or stock requirements

  • image

  • Planning table speed improvements
  • After running Rectify function, an alert is displayed if a solution was not found and some operations were moved to unscheduled.

Microplan

  • An indicator is displayed on microplan for operations, which dates could not be determined (e.g. because of too many closed shifts)

Date: 2022-07-18

Two new parameters were added to Automatic scheduling settings:

  1. Use productions of unscheduled operations
    • Takes into account input material that is produced by operations in other linegropus, even if those operations are not scheduled. This option is useful when scheduling later stages while earlier stages (which produce the input material) are not scheduled yet.
  2. Use requirements from unscheduled operations
    • Takes into account material requirements, which originate from operations in other linegrups, even if those operations are not scheduled. This option is useful when scheduling earlier stages while later stages (which consume the produced material) are not scheduled yet.

In both cases, unscheduled operations from the SAME linegroup are NOT considered.

image

Date: 2022-07-12

The logic of automatic scheduling was modified so that it also takes into account productions and requirements, which originate from unscheduled production orders in other linegroups.

  • Case 1: scheduling takes into account input material, which is produced by unscheduled orders in a preceeding linegroup.
  • Case 2: scheduling takes into account requirements, which originate from unscheduled orders in a succeeding linegroup.

Date: 2022-07-11

  • Batchop locations can now show orders from multiple lines. Line UUIDs need to be entered and separated with a comma.

  • image

Date: 2022-05-31

  • Cumulative requirements view added to Stock forecast view
  • Context menu (control+click) added to unscheduled operations on planning table
  • Stock forecast view added to planning table, showing the forecast according to current planning table schedule
  • image
  • Set “24/7” to all operations on a line. This pushes all operations forward.
  • image

Date: 2022-03-01

  • Weekly realization view can show scrap and downtimes report
  • image

  • Printing option in microplan view
  • image

Date: 2022-01-04

  • Planning table: Control+click on an order will show a context menu

  • Planning table: Order list in Advanced view now has an “i” for each line, where order details and changes after planning are displayed. Explanation of planning decision is also shown for each order. image

  • Weekly realization: a new week picker allows for selection of a random week

Date: 2021-11-26

  • Orders, which are out of the selected planning horizon, can not be saved to SAP. Such orders will be marked with a red “x” in Save window.

  • Planning table: in Advanced view (left pane), a new tab Issues is there to show New and Resloved issue, which might arise during rescheduling. The effects on other, dependent Linegroups is also considered.

  • The list of orders in Advanced view (planning table) is now more compact to accomodate more orders.

Date: 2021-11-10

  • In Planning table, Save unscheduled will save the current state of orders to LEAP.

    image

  • In Manage->Line-groups there is a new parameter planning_table_horizon_days whitch defines the time-frame in which planning table will take effect.

Date: 2021-10-20

  • Main tabs (plan, stocks, …) are now also drop-down menus.

    image

  • Gantt chart: Click on an order opens order details. The modal window also has a button to show Requirements.

    image

  • New option, to leave new orders (first time in LEAP) unscheduled by setting the plan_import_new_orders_skip_sim in Line-group managenemt

  • Option to print tool transfer document by setting enable_tool_transfer_print in Plant management

Date: 2021-10-06

  • Link to User documentation added in Help menu
  • “Requirements” button added to planning table and Gantt chart views, which displays fresh data from MD04 image

Date: 2021-10-04

  • Added export-users button to csv for admins and power-users in menu Manage->Users image

Date: 2021-06-18

  • “Lines” tab was renamed to “Plan” image

  • New view “Plan->Scrap” image

  • New view “Stocks->Requirements delays” image

  • Rows total on “Stocks->Stock status” image

  • New color scheme and new menu “Insights” on “Plan->Gantt chart” image

  • Delivery note number added in details on “Plan->Subcontracting” image